EIB TEST SCORE SHEET

Station S - AN/PVS-4 Point S-I-B

For use of this form, see USAIC Pam 350-6. The proponent is USAIS, DOTD.

Candidate's Name______________Rank________Unit_________________

TASK 1: OPERATE NIGHT VISION SIGHT AN/PVS-4


PERFORMANCE MEASURES-----Mark by each measure-------------PASS (P)or FAIL (F)

1. Remove sight from the carrying case.

2. Install the batteries.

a. Place the ON.OFF/tube brightness switch to OFF
b. Place the ON.OFF/reticle grightness switch to OFF
c. remove the battery caps (two each)
d. Insert the batteries (two each) correctly (negative with pointy terminal facing into the cap)

3. Turn the ON-OFF/tube brightness control to ON.

4. Turn the ON-OFF/reticle brightness control to ON.

5. Perform after.operation procecures

a. Turn the ON-OFF/tube brightness control to OFF
b. Turn the ON.OFF/reticle brightness control to OFF
c. Remove the batteries

Replace the sight in the carrying case.

CHECK: PASS______ FAIL______

REASON(S) FOR FAILURE

__________________________________________________

__________________________________________________

__________________________________________________

SCORER'S SIGNATURE________________DATE________________

Is this a retest? YES______NO______


FB FORM 20-39-R, 17 JAN 97

RETURN TO EIB HOME PAGE 1